Result of the Movement
Storyboard
The result of the earthmoving comprises a new 16.7-meter-long access with a 7.7% slope along the footprint of the old road, a small 10-meter-long ramp with an 11% slope, and a second 18.7-meter-long ramp with an 8% slope. It also includes an area from which material was extracted, covering approximately 150 square meters, and the 500-square-meter esplanade for the house.
It's essential not to forget that the process doesn't end here:
It is crucial to stabilize all the ramps, both to prevent significant damage from vehicles traveling on them and to avoid erosion from rainfall.