Danger of fungus formation

Storyboard

The delay in installing the roof caused the mezzanine floor to get wet, creating a risk of mold development and deterioration of the affected SIP panels. Therefore, it is crucial to dry and continuously monitor the situation to determine if additional measures are needed.

>Model

ID:(155, 0)