3. SIP Order Process

Storyboard

>Model

ID:(21, 0)



Estimating

Image

>Top



Relationship with a panel provider

Estimate in-house then send to provider

Area takeoff

Rules of thumb

Coct per sq. ft.

Lead the customer to good decisions

ID:(133, 0)



Quoting

Image

>Top



Prior to final design

Prior to engineering

Preliminary design contracts

ID:(134, 0)



Finding SIPs

Image

>Top



Where to look

SIPA vs. non_SIPA

Manufacturer vs. distributor

Product vs. services

ID:(135, 0)



Services

Image

>Top



Services

Installation

Site assistance

Panel Design

Engineering

HVAC analysis

Fabrication

Accessories

Edge prep

Lumber installation

Job site delivery

Accessories

Splines

Caulk

Sealants

Expanding foam

Fasteners

ID:(136, 0)



Panel design

Image

>Top



What's included

Support structure for roof system

Used for approval, fabrication, and installation

Plan for the trades

ID:(137, 0)



Engineering

Image

>Top



Is it required

Who's providing the services?

SIPs only or the whole structure

ID:(138, 0)



HVAC Analysis

Image

>Top



Discussed in chapter 8

Helps the customer make good decisions

Reduces your liability

ID:(139, 0)