System implementation

Storyboard

The process is meticulously planned and executed accordingly. Additionally, the strategy involves working externally between the SIP panels and the exterior fiber cement to protect the integrity of the SIP panels.

>Model

ID:(132, 0)



Work according to design

Description

>Top


To ensure the design is followed correctly, the key plans have been attached to the wall in front of where the system control panels will be installed:

It is important to note that the plan has not only been enlarged but also presents the latest version, including the most recent modifications, demonstrating the seriousness and commitment to the work.

ID:(900, 0)



Duct installation

Description

>Top


The key to not compromising the structure of the SIP panels is to install the conduits between the SIP panels and the fiber cement cladding:



This method is applied throughout the entire house:



At the penetration points, holes are drilled directly at the locations where the elements will be installed:

ID:(901, 0)